The Projects of the al-Abbas's (p) Holy Shrine
The Electricity cables' Network Station of the two Shrines.
As a result of the expansion of the holy shrines of Imam al-Hussayn and of al-Abbas (peace be upon both of them) as a result of the expansion of their functions' expansion in addition to the area between the two holy shrines, and to contribute to the stability of electricity power for both of them, the two holy shrines established a secondary power conversion station of a capacity of (2 × 31.5 mega Volt/Amp). The holy shrine of Imam al-Hussayn (peace be upon him) built it and the al-Abbas's (p) holy shrine supervised the works related to the supply of electrical cables to feed the two holy shrines and the area between the Two Holy Shrines, with a distance of 1500 meters from the station.
More about the project
Number of news 3
07-04-2015
29-04-2013
More
The project's pictures
Number of pictures 35
More