The works of the Children's Education House project have reached advanced stages, as most of its architectural, structural and mechanical joints have been completed. And the cadres of the engineering maintenance and construction department at the al-Abbas's (p) holy shrine have made great efforts in order to complete it within the timings and technical specifications.
The workers reached the stage of terminations that require precision in implementation.
Engineer Mohammad Mustafa Shaker, stated to al-Kafeel Network: “The staff working in this project harnessed all their efforts and were able in record time to reach this stage of the project, which was built using (steel structure) on an area of (400 square meters) that was divided into two floors, the first consisting of six rooms, a kitchen and bathrooms, while the upper floor contains (3) halls and administrative rooms with bathrooms. And the project was provided with advanced systems of cooling, extinguishing, fire, cameras and others. "
It is noteworthy that the project of the Children’s Education on the heritage of the Imams of the Ahl al-Bayt (peace be upon them) is one of the educational projects that the Dar al-Ilm School has adopted, which is based in the al-Abbas's holy shrine, as it aims to increase the awareness of children and young people of this rich heritage, according to scientific mechanisms and in a modern manner close to the minds of each age group. These kind of activities were previously held by the Hussainiyat and mosques, and after the great demand for it and the increase in its area, the idea of building this school came to be an incubator for its activities.