The final touches of the al-Abbas's (p) holy shrine's administrative complex.

The workers on the project of the administrative building of the al-Abbas's (p) holy shrine have begun to put the final touches.

By accomplishing this project, additional spaces will be provided to serve visitors inside the holy shrine of Aba al-Fadl al-Abbas (peace be upon him), as it will ensure the transfer of a number of departments operating inside the holy shrine.

The head of the engineering projects department at the al-Abbas's (p) Holy Shrine, Eng. Dea Majeed Al-Sa'egh, explained to the al-Kafeel Network, saying: “This project is considered one of the important projects. Modern designs have been developed for it contributing to creating an ideal work environment compatible with the services provided by the departments of the Holy Shrine. The works currently underway are mostly finishing works, all of which are running in parallel lines in order to finish it within the agreed times. The next stage will be the furnishing and equipping the building with the necessary supplies, according to the needs and nature of the work of each department that will occupy a position in this project.

It is noteworthy that the project is built on an area estimated at (1395 square meters) that has been invested vertically in ten floors. The area of ​​the underground floor is (1100) square meters that will be used as a parking, while the ground floor will be a reception hall in addition to a service facility, and the rest of the floors for the administrative work of the Holy Shrine's departments. The area of each of these floors is ​​(1250 square meters).
Readers' comments
No comment
Add a comment
Name:
The country:
Email:
Share: