Within the time period set for it, and according to the agreed engineering and technical criteria, the head of the engineering projects at the Al-abbas's (p) holy shrine; Dea' Majeed As-Sa'egh has announced that the project of the service's visitors complex on the road (Baghdad - Karbala) is currently in its final stages, proceeding the process if finalizing it to prepare for its opening in the next few days, to make it ready to receive the visitors who will be coming for the visit of Imam Al-Hussayn and his brother Aba Al-Fadl Al-abbas (peace be upon them). To be added to the series of service projects, such as the Host house of the holy shrine, the complex of Um Al-Baneen (peace be upon her) on the road (Najaf - Karbala) and the complex of Al-'Alqami on the road (Al-Hilla – Karbala).
Mr. As-Sa'egh said: "The executing companies of the project have made great efforts to accomplish this important project, thanks to the exceptional efforts made by the department of engineering projects at the Al-Abbas's (p) holy shrine in overseeing the design and the implementation of this vital project, making sure that the work is matching the approved designs, and the materials used in the construction correspond to the laboratory tests and quality control."
Noting: "The percentage of the completion is currently of more than 98%, with the completion of all the buildings inside the complex, which are 20 buildings of one floor and with a height of five meters, a lounge, sleeping area, health facilities, administrative rooms, a medical detachment, physiotherapy centre, kitchen and a reception, supplying it with water pumps and a sophisticated system of water and sanitation, along with green spaces and middle road that will be reforested with special types of trees according to the schemes of green spaces, as well as an integrated electric, fire, alarm and other systems."
It is worth mentioning that the establishment of this project comes after the success of the hospitality service complex established by the Al-Abbas's (p) holy shrine on the road (Najaf - Karbala) and on the road (Al-Hilla - Karbala) to provide services to the visitors of Imam Al-Hussayn and his brother Aba Al-Fadl Al-Abbas (peace be upon them), especially those coming on their feet from inside and outside Iraq during the days of the "zyarat Arba'een" every year, and also for the expansion of the services provided to the visitors and to complement the service projects set up on all roads leading the holy city of Karbala.
Noting, the department of engineering projects at the Al-Abbas's (p) holy shrine has carried out and supervised -since its inception after the fall of the former regime and up to now - dozens of large projects as well as hundreds of medium and small projects within and outside the holy shrine, and most of these projects were implemented by joint Iraqi cadres from the mentioned department and national and local companies, or rarely by companies with foreign labour.