The Al-Abbas's (p) Holy Shrine opens a factory of crushing gravel..

In order to supplement its projects with a material that has international standards and to complement the project of central blending , block factory and other related factories, the Al-Abbas's (p) holy shrine has opened a factory for crushing the gravel with multi-productivity lines (washed sand, gravel, boulder..) with international standards matching the Iraqi quality. The opening was attended by the Secretary-General of the Al-Abbas's (p) holy shrine; Sayed Ahmed Al-Safi.

The head of the Engineering projects department at the Al-Abbas's (p) holy shrine; Engineer Dea Majeed Al-Sa'egh explained to Al-Kafeel Network the following "Praise be to God, We have opened today the crusher plant project, which complements the site of the central blending and the sites of engineering projects department. And this is an important and significant part integrated to the projects of the Al-Abbas's (p) holy shrine, considering the selection of the appropriate, tested and washed materials that enter in the various project areas. So, it was important to have an equipped quarry for the projects of the holy shrines, and this crusher plant is part of it, and it will be, God willing, helping and supporting the projects of the holy shrine and the province's projects.

Adding: "Quality and efficiency are a slogan adopted by the Al-Abbas's (p) holy shrine in all its projects, and thank God and by the blessings of Abu Al-Fadl Al-Abbas (peace be upon him) during the previous period, through our completed projects and through our work, we have proved this slogan in the Department projects at the holy shrine, so we have gained a good reputation, and we started receiving invitations to participate in companies outside the boundaries of the holy shrine, which is a proof of the success of the holy shrine and the department of projects in this area."

Engineer 'Alaa 'Ammar, the gravel production plant official explained: " The Completion of this project was in one year; a record time. And the project includes a factory for the production of various gravels in addition to the washed sand with a production capacity up to 500 tons per hour for various products. This site is only a plant, and the primary raw material are taken from the quarries belonging to the holy shrine and all its productions holds a certificate of origin. We have also a field laboratory in which the checked and ready materials are received and we will get the approvals from the constituencies of the province, as this site is characterized by efficient materials, labour and high productivity."
Readers' comments
No comment
Add a comment
Name:
The country:
Email:
Share: