Progress in the project of the second educational and teaching complex.

As a result of the experience of the Department of Engineering projects at the Al-Abbas's (p) holy shrine in the supervision and projects' implementation thanks to the large number of the implemented projects, either small, medium or major projects, creating a fertile ground for how to deal with their executing companies, which is reflected positively on their implementation within the frameworks and mechanisms of the overall planning of each project and the detailed plans to control the time factor with the cost of the project and the quality of the executed works. And within these projects, the project of the second educational and teaching complex, which is one of the important projects of the holy shrine that have important strategic dimension.

Head of Engineering Projects Department at the al-Abbas's (p) holy shrine - direct and field supervisor of the design and implementation of this project - Engineer Diaa Majid Al-Sayegh, stated to Al-Kafeel Network: "The al-Abbas's (p) holy shrine paid special attention to certain projects in line with the difficult financial situation in general, because of their importance and the difficulty to postpone, such as the project of the second educational and teaching complex, which we tried our best to move the course of its work. "

He added: "Praise be to God, the work of this project is clearly progressing within the time and technical plans prepared for its implementation. The completion rate has reached a good stage under these circumstances. All construction works have been completed from concrete structures, Fire, alarm, communications, Internet, cameras systems. Other civil works were carried out, such as installing doors and windows and their structures, as well as laying down walls that were nearing completion. And we are preparing all matters to start other work that would increase the percentage of completion of the project as the work is ongoing and non-stop. "

It is to note that the project is located on the road Karbala – Hurr, and is established on an estimated area of 10.710 square meter, and it is a complementary project to the first group. The facilities of this group include two schools for boys with classrooms, labs and other educational facilities in three floors, and a kindergarten on an area of 1250 square meter also in three floors, as well as sports hall of multiple uses on an area of 1300 square meter, in addition to a school for girls on a total area of 2400 square meter, all of which have modern designs that fit in with nature of each facility, while maintaining the architectural harmony of the first group.
Readers' comments
No comment
Add a comment
Name:
The country:
Email:
Share: