Seeking the best levels for offering the best service for the pilgrim of EL-Abbas (p.b.u.h), the EL-Abbas holy shrine technical personnel continue their activities by establishing a water purification and sterilization station.
The head of the architectural projects of the EL-Abbas holy shrine engineer Dhya Mejeed EL-Saigh said that the project constructed on a 425 square meter area, 7,5 meters high, two stories. The diameter of the whole building is 850 square meters.
The project is being achieved by the EL-Ta’ir Iraqi Company and with an oversight by the EL-Abbas holy shrine.