Completion of the iron structure of the first section in the sixth Hayat lobby in al-Muthanna Governorate.

The staffs of the Engineering Maintenance Department of the al-Abbas's (p) Holy Shrine, completed the work of the Iron Structure for the first section of the Sixth Hayat Lobby for treating people with Corona virus in Al-Muthanna Governorate, and began the installation of "sandwich panels".
The resident engineer of the project, Safaa Mohamed Ali, explained to the al-Kafeel Network: "The works are continuing in progress, as the staffs strive to complete this project according to the specified timelines and according to the required standards and specifications."
He added: "The works have reached the following stages:
- Carrying out the works of cutting the iron structure of the first section and starting the work of cutting the second section.
- Beginning cutting the "sandwich panel" for the first section.
- Starting the ground works of the third and last section of the total lobby area.
- The work of laying the sewage pipes continues, as well as the completion of connecting the main conveyor pipe. "

He explained: "All of the aforementioned work is carried out sequentially and is conducted in parallel lines without any intersection between them, and there are works that are being prepared, which are the electrical works and their main wiring, and the stages of fixing (Gypsum Board) that will be launched soon."
Readers' comments
No comment
Add a comment
Name:
The country:
Email:
Share: