The engineering maintenance Department at the al-Abbas's (p) Holy Shrine completes preparing the street behind the al-'Alqami Complex for visitors.

The technical staff of the Engineering Maintenance Department at the al-Abbas's (p) holy shrine competed a service project based on preparing the road ('Aqd Bani Tamim) behind the al-'Alqami complex for visitors in the area of Freyha with two layers of sand and gravel, under the guidance of the Senior Official of the holy shrine; Sayed Ahmad al-Safi.

The project, which was completed, was conducted to make the road on the same level by removing the debris and preparing the street after the removal of the obstacles. Then, the working staff covered the street with sand in a thickness of 60 cm along the street of 500 m and with a width 7 m, then covering it with 15 cm of gravel with appropriate preparation and suitable water spraying.
Readers' comments
No comment
Add a comment
Name:
The country:
Email:
Share: