The al-Kafeel technical garage is witnessing advanced completion rates, and the Engineering Projects Department confirms that it will be one of the most important industrial icons in the holy province of Karbala.

The completion rate in the al-Kafeel technical garage project is at an advanced stage and the work is still underway to complete the rest of its parts. According to the work plan laid out by the engineering projects department at the al-Abbas's (p) holy shrine, all its capabilities are harnessed in order to accomplish it within its specified timing and specifications.

Eng. Dea' Majeed Al-Sa'egh, head of the Engineering Projects Department at the al-Abbas's (p) holy shrine, assured the al-Kafeel Network that "this project is one of the major and important projects carried out by the al-Abbas's (p) holy shrine, and it will be characterized through its international specifications that are in line with the envisaged objectives, by being one of the most important Industrial icons in the holy province of Karbala."

Al-Sa'egh added: "The works are currently underway in all sections of the project. The sections that are close to completion are section (A), which is dedicated to the administration of the project, which completion rate is more than 80%, and the current works are the finishing works. The segment (C), which is dedicated to the maintenance of large vehicles, has reached the completion rate of more than (90%) and is currently under finishing work too, such as exterior coating of the section. The situation in section (D), which is the warehouse complex for light and heavy cars, is the same. As for the percentage of achievement in section (E), which is a garage of two floors for vehicles, the first floor was allocated to the large and small vehicles, and the completion rate in it reached (75%)."

Adding: "The section (B) dedicated to maintenance workshops for small vehicles has been fully completed, to be added to what has already been completed, such as the fuel station which capacity is 1.7 million liters of gasoline, the parking for employees' cars as well as the spot for Maintenance garage."

Al-Sa'egh said, "These works are accompanied by the work of roads, pavements and foundations of the surrounding wall, and all work is proceeding in accordance with what was agreed upon and according to a pre-set plan. And God willing we will deliver it to the al-Abbas's (p) holy shrine within time and in compliance with the technical and engineering specifications prepared for it."

It is noteworthy that the al-Kafeel technical garage is the first specialized garage established in Iraq according to international specifications of high quality. It is built on an area of 72.125 m2 and a building area of 42.000 m2, which has been divided into five parts:

1- The administrative section.

  1. Fuel station.

3- Light vehicles repair section.

4- Heavy vehicles repair section.

5 - Warehouse for light and heavy cars.
Readers' comments
No comment
Add a comment
Name:
The country:
Email:
Share: