The Projects of the al-Abbas's (p) Holy Shrine
Project of the Restoration and Maintenance of the Holy Dome.
Because of the old age of the architecture of the shrine of Aba al-Fadl al-Abbas (peace be upon him) and the effects of the years on the building, as there is erosion of building materials, and the loss of linking material due to moisture and weather factors, and the occurrence of movement in construction and foundations due to the decline and rise of the water table, all of which lead to the weakness of the construction and the appearance of cracks on all sides, especially that the construction is of a large mass and high elevations. Due to the lack of periodic maintenance of these installations and buildings, these factors increase their effects on the construction and appear sometimes in dangerous manner on the construction. Therefore the management of the al-Abbas's (p) holy shrine directed its instructions to the engineering and technical maintenance departments and the engineering projects department of the necessity of periodic follow-up of the buildings of the holy shrine. So, a special committee was formed to submit the reports and directives on this matter. After completing the maintenance of the two minarets, which execution was assigned to the Ard al-Quds Engineering Company (first phase). The Holy Shrine began preparing the necessary disclosures for the maintenance of the holy dome, and presented to the Office of the Shiite Endowment a detailed report of the state of the dome, the disclosure of the treatment method, and the cost of the project.
More about the project
Number of news 1
More
The project's pictures
Number of pictures 12
More